Tim O’Hare Associates was involved at a number of crucial stages during the renovation of this urban green space located in the London Borough of Islington. The landscape scheme mainly compromised large numbers of woodland margin plants and a raised lawn that was expected to receive intensive use.
At the early design stage (Stage C), the practice was commissioned to carry out a Soil Resource Survey for the site, looking at both horticultural quality and ground contamination levels. This assessment found soils with no significant contamination and good horticultural composition for tree and shrub planting – so much so that the requirements for additional soil ameliorants were minimal. However, the site soils possessed inappropriate properties for the proposed lawn area, where the levels of foot-trafficking were anticipated to be high. The survey also revealed several areas with severe compaction problems that would need to be addressed.
During design stages D and E, a Soil Management Plan was developed for the site, which included appropriate cultivation techniques to decompact the soil without harming existing trees, tree pit details, and specifications for the turf, the specialist rootzone and drainage media for the raised lawn.
During construction (Stage K), a site inspection role was undertaken to monitor the main soil-related operations on the site to ensure compliance with the landscape specification. This covered:
Subsoil decompaction;
Topsoil cultivations;
Tree pit construction and backfilling;
Sourcing and testing of imported rootzone;
Turf establishment;
Practical Completion;
More Case Studies
Oman Botanic Garden, Muscat, Oman
When completed, the Oman Botanic Garden, situated 35km to the west of Oman’s capital, Muscat, will host the largest collection... Read more
NATS Air Traffic Control Centre, Prestwick
The National Air Traffic Services (NATS) new air traffic control facility at Prestwick Airport included a 12 hectare external environment... Read more
Queen Elizabeth Olympic Park, Stratford, London
The Olympic Park consisted of over 250 acres of parkland and soft landscaping.
Arundel Square, Islington, London
Working alongside landscape architects Remapp and structural engineers Price & Myers, Tim O’Hare Associates was involved throughout the renovation and extension of this Edwardian Square in the London Borough of Islington.
Chavasse Park, Liverpool
Chavasse Park is 20,000m² green roof concealing a 3000 space underground car park.
Uppingham School Sports Centre
Uppingham School undertook a programme of sports pitch construction and renovation.
Terminal 5 Heathrow
The Terminal 5 development at Heathrow Airport, the largest construction project in Europe.
A3 Hindhead Improvements Scheme, Hindhead, Surrey
The A3 Hindhead Improvement Scheme (6.5 km) creates a continual dual carriageway.
Mezyad Desert Park and Hotel, Al Ain, UAE
The Mezyad Desert Park and Hotel project site is located in Abu Dhabi Emirate.
Duncan Terrace, Islington, London
Tim O'Hare Associates was involved during the renovation of this urban green space.
British Sugar TOPSOIL
British Sugar TOSPOIL is the UK's largest supplier of quality topsoils to the construction